论文部分内容阅读
近几年的建筑工程项目中,我们为了保证地下室侧墙的施工安全与施工质量,在施工中经常都将参与工程建设的各方责任主体责任科学进行分配,严格贯彻和落实国家法律和技术规范。在地下室侧墙施工方案的优化、论证和审核上尽可能的优化,并通过提高测量放线、模板安装、钢筋安装、混凝土浇筑方面的优化,从而达到贯彻和落实目的。本文结合工程实例,就临近地下室同时施工钢筋混凝土侧墙施工技术做了详细的探讨,旨在解决传统地下室侧墙施工问题,保证施工质量和进度。
In the recent years of construction projects, in order to ensure the construction safety and construction quality of the basement side walls, we always assign the responsibility responsibilities of all parties involved in the construction of the project to the scientific allocation and strictly implement and implement the national laws and technical specifications . Optimize the optimization, demonstration and verification of the construction plan of the basement side wall, and achieve the purpose of implementation and implementation through the optimization of measurement pay-off, template installation, reinforcement installation and concrete pouring. Based on the engineering examples, this paper discusses in detail the construction technology of reinforced concrete side wall near the basement, and aims to solve the construction problems of the side wall in the basement and ensure the construction quality and progress.