论文部分内容阅读
水利工程建设的目的就是兴利除害,在保障国民经济健康发展和社会各部门需求下,进一步加强保护下游地区人民群众的生命财产安全。水电站溢洪道是河道建筑中最重要的一项建筑,在很多水电站中是必须要设立的建筑物,在施工时要对溢洪道严格要求,这不仅关系着经济利益也关系着人们的财产安全,对溢洪道的开挖施工就要有过硬的技术。本文主要以鄂坪水电站作为研究案例,接着针对其地基地质条件与边坡处理、溢洪道的稳定计算进行详细的阐述。希望对于相关的人士具有参考与借鉴的作用。
The purpose of water conservancy construction is to promote profit and remove harmful effects. Under the requirement of ensuring the healthy development of the national economy and various social sectors, the safety and life safety of the people in the downstream areas should be further strengthened. Hydropower station spillway is one of the most important buildings in the river construction. In many hydropower stations it is necessary to set up the building, which requires strict requirements for the spillway. This is not only related to economic interests but also to people’s property safety. Excavation construction must have excellent technology. This paper mainly uses the Eping Hydropower Station as a case study, and then elaborates on the geological conditions of the foundation and the stability of slope treatment and spillway. Hope for the relevant people have a reference and reference.