温州华侨饭店主楼于1963年1月竣工,至今已二十年。建筑物最大沉降量达1292毫米,目前沉降速率在0.009~0.016毫米/天之间。除沉降量大,造成室内地坪相对标高太低,以至在大暴雨时底层会浸水等问题外,工程结构完好,没有墙身裂缝。沉降差异的绝对值虽然比较大,但主要是纵向倾斜,而相对弯曲很小。从结构的角度来看,工程中的经验是可取的。
The main building of Wenzhou Overseas Chinese Hotel was completed in January 1963 and has been in service for 20 years. The maximum settlement of buildings is 1292 mm. The current settlement rate is between 0.009 and 0.016 mm/day. In addition to the large amount of settlement, resulting in the indoor floor relative elevation is too low, so that the underlying water will be flooded during heavy rain and other issues, the project structure is intact, there is no wall cracks. Although the absolute value of the settlement difference is relatively large, it is mainly inclined in the longitudinal direction and the relative bending is small. From a structural point of view, experience in engineering is desirable.