本文叙述了59年为支援农业水利化和地方工业用电,我队在白龙江一个水电站坝址勘测工作中进行水上电测的方法和经验。从这次的结果看,即使在比较困难的条件下,把物探工作用于解决工程问题也是完全可能的。文中叙述了水上电测的工作程序和施工方法及结果的室内整理、工作中探索到的点滴经验。由于水平所限,加以工作时间很短,不足之处在所难免,望同志们指正。
This paper describes the methods and experiences of 59 years of hydropower measurement conducted by our team in the investigation of a dam site of a hydropower station in Bailongjiang in support of agricultural water conservancy and local industrial electricity use. From this result, it is quite possible to use geophysical work to solve engineering problems even under difficult conditions. The article describes the working procedures of water power measurement and construction methods and results of indoor finishing, work experience to explore the bit by bit. Due to the limited level, to work a very short time, inadequacies inevitable, hope comrades correct.