论文部分内容阅读
从钻孔灌注桩施工中钢筋笼上浮的受力状态,分析上浮原因及对工程质量的影响,提出预防措施。
From the stress state of the steel cage floating in the construction of cast-in-place bored pile, analyze the reason of floating and the impact on the project quality, and put forward the preventive measures.