湖南省益阳县新河大泵站撇(排)洪河,具有防洪、灌溉、排涝、发电等多种效益。由于各项工程功能目的不同,对撇洪河水位高低要求各异,省水利水电厅组织有关局、科研所承担“新河大泵站撇洪河水位优化调度”课题。从1983年起,课题组利用系统工程的原理和分析方法,以寻求全局耗能最小为目标。分季节确定蓄水位,然后根据具体时段耗能的某一主要
Yiyang County, Hunan Province, the new pumping station write (row) Honghe, flood control, irrigation, drainage, power generation and other benefits. Due to the different functions and purposes of the project, the requirements of the water level of the flood diversion river are different, and the Bureau of Water Resources and Hydropower, the relevant bureau and the scientific research institute undertake the task of “optimizing the water level of the floodwall of Xinhe Large pumping station”. Since 1983, the research team has used the principles and analytical methods of systems engineering to seek for the minimum global energy consumption. Sub-season to determine the water level, and then according to the specific time period of a major energy consumption