论文部分内容阅读
桩基施工时的塌孔现象比较普遍并增加工程成本,制约工程顺利进行常常会延长工期。文中介绍的处理方法、以及预防措施操作简单,对类似工程问题的解决具有推广价值。
The collapse of the pile foundation during construction is common and increases the project cost. Constraining the smooth progress of the project will often prolong the construction period. The treatment methods and preventive measures described in the article are simple to operate and have a promotion value for the solution of similar engineering problems.