在设计施工总承包合同中,如何区分设计变更和工程变更,进而利用发包人要求模糊调增包干合同价呢?从沙特麦加轻轨项目的巨额亏损,到波兰高速公路项目被退场,中国承包商的设计施工总承包之路相当艰难。设计施工总承包合同商务管理的特别之处在于发包人要求及变更调价,涉及到如何理解发包人要求错误、承包人文件缺陷,如何区分设计变更和工程变更,进而利用发包人要求模糊进行变更、调增包干合同总价呢?因缺陷而变更发包人已批准设计的不能调整合同价格在工程施工合同中,经发包人批准的设计变更是合同价格调整最主要原因之一。在设计施工总承包合同中,经发包人批准的设计变更可以调整合同价款吗?先看如下案例。
How to distinguish the design change from the engineering change in the design and construction general contracting contract, and then make use of the outsourcer requirements to increase the contracted price? From the huge loss of the Saudi Mecca light rail project to the exit of the Polish expressway project, the Chinese contractor The design and construction of general contracting road is quite difficult. Design and construction general contract contract business management is special about the outsourcer requirements and change the price adjustment, involves how to understand the outsourcer error, contractor file defects, how to distinguish between design changes and engineering changes, and then use the requirements of the Employer to change fuzzy, Increase the contract total contract price? Due to defects and change the contractor has approved the design can not adjust the contract price In the construction contract, the design changes approved by the Employer is one of the most important reasons for the contract price adjustment. In the design and construction general contracting contracts, the design changes approved by the Employer can adjust the contract price? Look at the following case.