通过二滩水电站“980702”次大洪水的暴雨天气系统,对流域内(主要是坝址区间)和邻边台站降雨时空分布及其成因等作了系统初步分析,并对洪水顶报进行了初步总结,从而进一步认识了水文、气象预报及水库调度在水电站工程防汛抗洪工作中的参谋耳目作用。
Through the rainstorm weather system of “Ertan Hydropower Station ” 980702 "major flood, a systematic preliminary analysis was made on the spatiotemporal distribution of rainfall in the basin (mainly the dam site) and its adjacent stations, Carried out a preliminary summary to further understand the hydrological and meteorological forecasts and reservoir scheduling in the flood control and flood fighting work of the hydropower station’s chief staff role.