论文部分内容阅读
德兴铜厂矿区属于特大型斑岩铜矿床,伴生有金、银、钼、硫可综合回收。矿体厚度大,埋藏浅,设计采用露天开采。该矿床在125米标高以上分为南、北两个山头,125米标高以下则连成一体。七十年代初在南山实行露天开采,现已形成1.5万吨/日采选能力。
Dexing Copper Plant belongs to a large-scale porphyry copper deposit, associated with gold, silver, molybdenum, sulfur can be integrated recovery. Thick ore body, buried shallow design of open-pit mining. The deposit at 125 meters above the elevation is divided into south and north two hills, 125 meters below the elevation are integrated. The early 1970s in Nanshan opencast mining, has now formed 15,000 tons / day mining capacity.