论文部分内容阅读
邕江大跨度军用组合吊桥,是国务院、中央军委交通战备领导小组下达给广州军区与工程兵工程学院道桥渡教研室合作的试验项目。从一九八四年七月开始,我院道桥渡教研室先后派出十五人次,共同进行方案论证、方案设计、技术设计、架设和通车试验.由广州军区工程兵部队于一九八五年七月架成,十一月交付使用。
Hanjiang large-span military composite suspension bridge is the State Department, the Central Military Commission prepared the leading group for traffic warfare to the Guangzhou Military Region and Engineering Corps Bridge Road, Department of Education pilot project. Starting from July 1984, the department of Daodashidu Department has dispatched 15 person-times to jointly carry out the program demonstration, program design, technical design, erection and traffic test, and the Corps of Engineers of Guangzhou Military Region conducted the inspection in July 1985 Month frame, delivered in November.