尾砂的排放与堆存是苏联各采选公司的一项技术复杂、耗能高和费用大的工序。在以苏联建国50周年命名的英古列茨采选公司,建成了苏联欧洲平原地区最高的一个尾矿库,并已投入使用。尾矿库的建设是一整套大型的生产工艺系统,它包括下列工艺过程:堤坝加高、尾矿的水力输送、生产循环供水及防渗措施等。该公
The discharge and storage of tailings are a complicated, energy-intensive and costly procedure for mining companies in the Soviet Union. In the Ingoluse mining company named after the 50th anniversary of the founding of the Soviet Union, the tallest tailings depot in the European plains of the Soviet Union was built and put into operation. The construction of the tailings pond is a complete set of large-scale production process system, which includes the following technological processes: levee damming, hydraulic conveying of tailings, production of circulating water supply and seepage control measures. The public