论文部分内容阅读
10月份,东莞虎门港两个5万吨级的深水泊位正式开港运营,沙田港区7号、8号泊位也同日开工建设。位于沙田港区西大坦作业区的5号、6号泊位,是虎门港首个5万吨级多用途深水泊位
In October, two 50000-ton deepwater berths at Humen Port in Dongguan officially opened for operation. The berths at No. 7 and No. 8 in Shatian Port started construction on the same day. The berths 5 and 6 located in the Sitaitan operation area of Shatian Port are the first 50000-ton multi-purpose deepwater berth in Humen Port