论文部分内容阅读
以某高薄壁双曲线冷却塔爆破拆除为例,详细介绍了其数值模拟全过程,其模拟结果与实际较吻合,可以为类似工程数值模拟提供参考。
Taking a high-thin wall hyperbolic cooling tower demolition as an example, the whole process of numerical simulation is introduced in detail. The simulation results are in good agreement with the actual ones, which can provide reference for similar engineering numerical simulation.