天安门前建成地下通道

来源 :市政技术 | 被引量 : 0次 | 上传用户:guobinlei
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
首都新十六景之一,当今世界上最大的广场北京天安门广场与金水桥之间,于今年一月至四月修建了两条地下通道,两条地道分别由广场穿过东、西侧路及东、西长安街,每条通道长约268米。地道工程设计考虑了高峰节日广场游人可达百万人次,地道净宽11.90米,净高2.75~2.80米,设计小时人流通行量为21000人次。两通道各设了三个行人进出 One of the New 16th Kingdoms of the capital. Between Beijing’s Tiananmen Square and Jinshui Bridge, the largest square in the world, two underground corridors were constructed between January and April this year. Two tunnels respectively run from the square through the east and west sides And east and west Chang’an Avenue, each channel length of about 268 meters. Authentic engineering design takes into account the peak holiday Square visitors up to millions of people, the authentic net width of 11.90 meters, a net height of 2.75 ~ 2.80 meters, the design of hour traffic flow 21000 passengers. Two pedestrians set up three access
其他文献
本文根据现场调查的钢筋混凝土轨枕伤损情况与室内实验资料,综合分析了钢筋混凝土轨枕各种伤损的原因;同时,根据目前现状,提出了防止轨枕伤损与延长其使用寿命的一些措施。
渔民不捕鱼时,就忙于修补渔网。在渔业行当中,这是最费力的工作之一。尤其困难的是修补深水拖网。一方面由于它们的结构复杂,一方面由于它们的底部特别容易出现不均匀的破碎
养虾业的成功是自然因素与人的智慧的结晶,要使养虾生产能取得较高的效益,必须采取积极措施,改进养殖生产的技术和虾池结构.也就是说虾池结构是基础,放苗前准备工作是前提,饵
长期以来工务段检测线路手段处于落后状态,远不能满足高速、大运量的需要,文章详细介绍了兖州工务段实现动态检测线路,指导线路维修养护的的经验。 For a long time, the me
在2ТЭ116型和TЭ1OМ型内燃机车的标准结构无导框转向架的弹簧悬挂装置中采用了摩擦减振器,使用过程中发现摩擦片磨损不均匀,金属橡胶套过早地出现了压破现象,金属陶瓷润
台湾屏东县内埔乡陆仕企业公司最近开发了凤梨虾等草虾加工品,行销美、日等国 受到好评。近年来,由于东南亚地区的泰国、马来西亚、菲律宾和印度尼西亚等国大量养殖草虾,行
由《水产科学》、《齐鲁渔业》编辑部联合发起,在中国水产学会赞助下,北方地区水产学会所属科技期刊编辑经验交流会于8月22日至24日在辽宁省海洋水产研究所招待所召开。出席
一、施工概况在大、维修工作中,更换混凝土轨枕螺旋道钉,一直是工务部门难度较大的一项工作。我段管内京包线原67型螺旋道钉铺设近159km,需全部拔出,重新锚上TB564~76螺旋道
近日,在法国巴黎举行的“世界卫星业务周”期间,玻利维亚航天局凭借由中国航天科技集团公司研制的玻利维亚通信卫星一号的成功运营,荣膺2015年度全球最佳新秀卫星运营商。201
4月10日,由福建省商业联合会(以下简称“省商会”)主办的“福建省倡导‘放心茶品牌’暨茶业经营创新发展研讨会”在福清召开,省内有关领导、茶界专家及省内外茶企代表150多人