以北京地铁四号、十号线黄庄站工程为背景,结合现场施工量测结果,阐述了四号线在浅埋暗挖法施工条件下地表沉降产生的原因及沉降规律,分析了影响地表沉降的因素,并提出控制沉降的措施。
Based on the project of Huangzhuang Railway Station on the 4th and 10th lines of Beijing Subway, combined with the field test results, the causes and settlement rules of surface subsidence of Line 4 under the conditions of shallow buried tunneling are elaborated. Settlement factors, and put forward measures to control the settlement.