论文部分内容阅读
本文着重分析了一些影响巷道掘进速度的主要技术问题,如人员问题,管理问题等问题,并提出了一些在施工过程中应当采用的对于提高巷道掘进效率有所提高的措施。
This paper analyzes some of the main technical problems that affect the speed of roadway driving, such as personnel problems and management problems, and puts forward some measures that should be taken to improve tunneling efficiency in the construction process.