我局在水利电力部和市委的领导下,自1961年进一步坚持贯彻执行设备预防性计划检修以来,经过全体职工积极不懈的努力,加强了检修的技术管理和责任制度,制订了扎扎实实的具体措施计划,重视了人员的培训工作,注意了上下,内外的密切配合,因而克服了材料、备品、人力、技术等方面的种种困难,胜利地完成了计划检修任务。1961年我局全网77%的机和89%的炉都进行了检修,通过检修共消除了大小设备缺陷700余项。这就为设备安全生产,顺利地完成国家计划,提供了有力保证。因而,1961年
Under the leadership of the Ministry of Water Resources and Electric Power and the Municipal Party Committee, and since 1961, the Bureau has further adhered to the implementation of the preventive maintenance plan for equipment, and through the unremitting efforts of all employees, it has strengthened the technical management and liability system of overhaul and established a solid foundation. The specific measures plan attached importance to the training of personnel and paid attention to the close cooperation between the inside and outside, thus overcoming various difficulties in materials, spare parts, manpower, and technology, and successfully accomplishing the planned maintenance tasks. In 1961, 77% of the machines in our network and 89% of the furnaces were overhauled, and over 700 items of equipment defects were eliminated through inspections. This ensures the safe production of the equipment and smoothly completes the national plan and provides a strong guarantee. Thus, 1961