充分利用“九五”期间4个项目、8个机组的建设,增强自主化意识,以提高我们核电设计自主化、项目管理自主化、建筑安装施工自主化和技术支持自主化方面的能力和水平。设计和建造自主化和设备国产化,是80年代以来我们在奏山核电二期工程前期准备工作中一直坚持的一项基本方针。从根本上讲,这也是下个世纪我们核电产业有较大发展的一条必由之路。我们在“九五”期间的核电建
Make full use of the construction of 4 projects and 8 generating units during the Ninth Five-year Plan to enhance the awareness of self-reliance so as to enhance our ability and level of independence in nuclear power design, project management autonomy, construction, installation and construction autonomy and technical support autonomy . The independence of design and construction and the localization of equipment are a basic principle that we have always insisted on in the preparatory work for the second phase of the nuclear power plant since the 1980s. Fundamentally speaking, this is also the only way for our nuclear power industry to have greater development in the next century. We built nuclear power during the Ninth Five-year Plan period