论文部分内容阅读
苏丹管道工程南起木格莱盆地,经黑格林格热带雨林、沼泽,过萨亚拉沙漠,横穿世界第一长河——尼罗河,跨红海山区,北至苏丹港;全长1506公里,管径28英寸。该工程由毛里求斯大尼罗河石油作业有限责任公司投资,合同额2.95亿美元(不包括主管材费用)。中油管道建设有限责任公司以CPECC名义EPC总包,于1998年5月1日开工,1999年4月30日机械完工,参建员工2000余人。现本刊发表该项目总经理马骅工作纪事一则,由此可见苏丹管道工程之艰巨及中国管道施工者之顽强拼搏精神。
Sudan plumbing project from Muglai Basin, the Haiglinge tropical rainforest, swamp, over the Yarra desert, across the world’s largest river - the Nile, across the Red Sea mountains, north to Port Sudan; a total length of 1506 km, the tube 28 inches in diameter. The project is invested by the Greater Nile Petroleum Co., Ltd. in Mauritius, with a contract value of US $ 295 million (excluding the cost of main timber). CNPC Pipeline Construction Co., Ltd. EPC EPC package in the name of CPECC, started on May 1, 1998, April 30, 1999 mechanical completion, construction of more than 2,000 employees. Now published in the magazine General Manager Ma Hua work record one, we can see the arduous pipeline project in Sudan and China’s pipeline construction workers tenacious fighting spirit.