论文部分内容阅读
首钢矿业公司杏山铁矿(以下简称“杏山铁矿”)是首钢总公司第一家自主建设的地采矿山,前身为首钢大石河铁矿杏山采区,始建于1966年,2005年结束露天开采。2003年7月筹备杏山地采项目,2004年7月完成可研报告,2005年初首钢总公司批准立项,2006年2月16日破土动工,2006年7月10日杏山铁矿成立。2011年7月底杏山地采正式投产,同年9月初实现达产。从投产到达产、稳产,仅用40天时间,创出了国内一流水平。目前,杏山铁矿已发展
Shougang Mining Company Xingshan Iron Mine (hereinafter referred to as “Xing Shan Iron Mine”) is Shougang Corporation’s first self-built underground mining hill, formerly Shishou Dashihe iron ore Xingshan mining area, was founded in 1966 Open ended mining in 2005. 2003 July preparation of Xingshan to mining project, in July 2004 to complete the feasibility study report, early 2005 Shougang Corporation approved the project, February 16, 2006 groundbreaking, July 10, 2006 the Xing Shan iron ore was established. By the end of July 2011 Xingshan to mining officially put into operation in early September the same year to achieve production. From production to production, stable production, only 40 days, creating a domestic first-class level. At present, Xing Shan iron ore has been developed