论文部分内容阅读
传统的高层住宅建筑在地上主体结构完成后再进行装饰部分的施工,常导致工期长,施工成本大,已经越来越不适应现代产业化建造领域。怎样实现地上主体与装饰工程同步穿插施工?本文以常州某高层住宅项目为例介绍施工流程、工艺要点及施工经验,为类似工程设计施工提供参考借鉴。一、工程概况本工程位于常州市武进区,由7栋高
The traditional high-rise residential buildings in the main structure of the ground after the completion of the decorative part of the construction, often lead to a long construction period, the construction cost, has become increasingly unsuited to the field of modern industrial construction. How to realize the interspersed construction of the main body and the decoration project? In this paper, a high-rise residential projects in Changzhou as an example to introduce the construction process, process points and construction experience for the design and construction of similar projects to provide reference. First, the project profile The project is located in Wujin District, Changzhou City, from 7 high