淮阴抽水站是京杭运河续建工程的重要项目之一,设计流量一百二十秒立米,四台机组,每台配有二千千瓦立式同步发电机,类同江都抽水站的第四站,主要任务是为京杭运河补给水源。该站位于高良涧越闸以东七百米、苏北灌溉总渠北堤的北侧,与入海水道新泄洪闸相邻,进水引河连接总渠,出水经高良涧越闸入二河。计划一九八五年建成投产,可将江都站,淮安站抽引的江水,提入洪泽湖或向北输送。不仅能给北方缺水地区送水,而且对发展京杭运河的航运、补给徐州电厂用水、解决南四湖地区的用水矛盾、改善淮北
Huaiyin Pumping Station is one of the important projects for the continued construction of the Beijing-Hangzhou Grand Canal. The design flow is 120 seconds and four units, each with a four-kilowatt vertical synchronous generator and a fourth station similar to Jiangdu Pumping Station , The main task is to supply water for the Beijing-Hangzhou Grand Canal. The station is located 700 meters east of the Liangliang stream beyond the gate north of the Northern Irrigation Canal North embankment, and into the sea adjacent to the new sluice gates, water diversion canal connecting the main canal, the water flow through the high-grade stream into the Second River. It is planned that the project will be completed and put into operation in 1985 and the river drawn from Jiangdu Station and Huaian Station will be brought into Hongze Lake or transported northward. Not only to the water supply in northern water-scarce regions, but also for the development of shipping Beijing-Hangzhou Grand Canal, Xuzhou power plant power supply to solve the water conflicts in Nansihu region to improve the Huaibei