论文部分内容阅读
工程造价管理是一项综合性较强的学科,不但涉及经济管理学的范畴,还与技术工程息息相关。水利工程全过程造价管理是一项复杂的系统的工程,大致可分为前期投资、工程建设、项目运营三个阶段。在工程建设的各个不同阶段,对水利工程的造价的需求也不相同。投资方要想做到以最少的资金达到最大的利益,就必须要加强对各阶段造价资金的严格管理,从而实现资金效益的最大化。本文对水利工程建设全程造价的现状深入分析,就如何提高对水利工程造价的控制管理进行了探讨。
Project cost management is a comprehensive discipline, not only relates to the field of economics and management, but also with the technical engineering is closely related. The whole process of water conservancy project cost management is a complex systematic project, which can be roughly divided into three stages: pre-investment, project construction and project operation. At different stages of construction, the demand for the cost of water conservancy projects is also different. If investors want to achieve the maximum benefit with the least amount of funds, they must strengthen the strict management of the cost funds in all stages so as to maximize the financial benefits. This article analyzes the status quo of the construction cost of water conservancy project in depth and discusses how to improve the control and management of the cost of water conservancy project.