一、前言官厅水庫蓄水以后,两岸岩石渗水量較大,坝后渗流量最大实测記录达0.20公方/秒,由于机械管涌,坝下游坡脚附近曾发生20处塌坑。这种不良的工程地質現象需要进行处理,处理方法除灌浆和下游排水等方案外,沿上游岩石坡面作塑性防渗层是可以考虑的方法之一,当时官厅水庫坝前最大水深达25公尺,庫內蓄水約10亿公方,若用一般干筑方法施工,必須放空庫水,将影响发电和首都工业用水,所以提出不放空庫水用水中倒土方法建造上游防渗层的問題。
I. INTRODUCTION After the storage of the Guanting Reservoir, the seepage of rock across the Strait was greater. The maximum observed seepage of the dam reached 0.20 square meters per second. As a result of mechanical piping, there were 20 collapsed pit near the foot of downstream dam. This bad engineering geological phenomenon needs to be dealt with. In addition to the grouting and downstream drainage schemes, the treatment method can be considered as a plastic anti-seepage layer on the slope of the upper rock slope. At that time, the maximum water depth in front of the Guanting Reservoir dam was 25 km There are about 1 billion square meters of water storage in the reservoir. If it is constructed by ordinary dry-building method, the reservoir water must be emptied, which will affect the power generation and capital industry. Therefore, it is proposed that the upstream seepage prevention layer problem.