南京钢铁集团江苏淮钢有限公司:特殊钢大棒材项目投资总额:144739.3万元进展阶段:工程设计建设周期:2006年~2008年建设内容/主要产品:年产大棒材80万吨, 连铸坯82万吨关键设备:精炼装置、连铸机、加热炉、半连续式棒材轨机、水处理设备该项目在淮钢厂区内建设,不新征土地;项目所需铁水,由淮钢通过压缩小方坯生产能力后的炼钢系统供应;项目所需水、电、气等由淮钢和
Nanjing Iron and Steel Group Jiangsu Huai Steel Co., Ltd.: Special steel big bar Project total investment: 1447393000 Progress stage: Engineering Design and Construction Period: 2006 ~ 2008 Construction Content / Main Products: Annual output of 800,000 tons of large bars, and even Billet 820000 tons of key equipment: refining equipment, continuous casting machine, heating furnace, semi-continuous bar rail machine, water treatment equipment in the construction of this project in Huai Steel plant, do not levy land; the project needs hot metal, Huai Steel through the production of compressed billet production capacity of the steelmaking system supply; water, electricity, gas and other projects required by the Huaigang and