论文部分内容阅读
在社会主义建設高潮中,东北各省的工業正在蓬勃地發展着,因此需要不同牌号煤的量日漸增加。除滿足目前所需要的質和量以外,还应为第二个和第三个五年計划及以后年代的工業建設的需要准备資源条件。为此除擴建、恢复、新建現有生產矿区的礦井外,在新区進行大規模的物理探礦、地質調查和進一步的勘探就更加重要。东北各省的煤田在敌伪时期,日人曾在大范圍內進行过掠夺式的調查和开采。解放后,在党的正确領
In the climax of the socialist construction, the industries in the northeastern provinces are flourishing, so the need for different grades of coal is steadily increasing. In addition to meeting the current qualitative and quantitative requirements, resource requirements should be prepared for the needs of industrial construction in the second and third five-year plans and beyond. For this purpose, it is even more important to carry out large-scale physical prospecting, geological surveys and further exploration in the new area except for the expansion, restoration and construction of new mines in existing production mines. Coalfields in the northeastern provinces during the period of the enemy and the puppet, the Japanese people conducted a predatory investigation and exploitation in a large area. After the liberation, the right collar in the party