小寨电站位于四川省奉节县兴隆区荆竹乡小寨双流村。采用低坝取地下暗河水,引用流量为6.9m~3/s,设计水头达339m,装机容量为3×6 300kW,年利用小时5 096h,多年平均发电量为9 632万kW·h,是目前川东地区水头最高,装机容量最大,出线电压等级最高的一个电站。该电站于1987年4月正式动工,1989年底3台机组全部发电。计划投资2 378万元,实际投资1978万元,提前4个月全部完成主体工程;羊市坪110kV变电站仅5个多月就全面竣工,单位千
Xiaozhai Power Station is located in Shuangliu Village, Xiaozhai, Jingzhu Town, Xinglong District, Fengjie County, Sichuan Province. Using low underground dam river water, the reference flow of 6.9m ~ 3 / s, design head up to 339m, installed capacity of 3 × 6 300kW, annual utilization hours 5 096h, years of average generating capacity of 963200kW · h, is At present, the eastern region of the highest head, the largest installed capacity, the highest outlet voltage level of a power station. The power station was officially started in April 1987, by the end of 1989 all three units generating electricity. Plans to invest 23.78 million yuan, the actual investment of 197800 yuan, 4 months ahead of schedule to complete the main project; sheep Ping 110kV substation completed only over 5 months, in thousands