论文部分内容阅读
某炭素厂的原料贮仓为钢筋砼结构,由两组三个连体的方形筒仓组成,一字形排列,座落于箱形基础上。每个筒仓的四角处均设有断面为700×700mm 的柱子,筒仓壁厚500mm,高度21.2m,两组筒仓分别采用大楼板爬模施工,现就其施工工艺阐述如
The raw material warehouse of a carbon plant is a reinforced concrete structure consisting of two sets of three conjoined square silos, arranged in a single line and located on a box-shaped foundation. Each corner of the silo is provided with 700×700mm section pillars. The silo wall thickness is 500mm and the height is 21.2m. The two groups of silos are respectively used for building slabs to climb and mold. The construction process is described as follows.