针对软弱破碎围岩隧道施工极易失稳的问题,采用FLAC2D软件建模对软弱破碎围岩隧道的施工过程进行数值仿真模拟,分析了水平旋喷预加固的效果;探讨了CRD(center cross diagram)法和三台阶法对隧道施工稳定性的影响。研究结果表明:水平旋喷预加固有利于控制沉降和衬砌内力;CRD法最大沉降值、衬砌内力均比三台阶法小,应优先选用;CRD法的中台阶左侧开挖为关键环节,应及时施作衬砌。在此基础上提出了一系列施工优化方案,在厦门公路隧道中实施应用,取得良好的效果,对同类隧道施工具有重要参考意义。
Aimed at the problem that the construction of soft crushing surrounding rock is easy to be instability, the construction process of soft crushed surrounding rock tunnel is numerically simulated by FLAC2D software and the effect of horizontal rotational jet pre-reinforcement is analyzed. The center cross diagram ) Method and three steps method on the stability of the tunnel construction. The results show that the horizontal jet pre-reinforcement is good for controlling the settlement and the lining internal force. The maximum settlement value of CRD method and lining internal force are all smaller than the three-step method, and should be selected preferentially. The left-hand excavation of CRD method is the key step, Timely for the lining. Based on this, a series of construction optimization schemes are put forward, which are applied in the highway tunnels in Xiamen and achieved good results, which is of great significance to the construction of similar tunnels.