Finite-time Consensus for Multi-agent Systems via Nonlinear Control Protocols

来源 :International Journal of Automation and Computing | 被引量 : 0次 | 上传用户:intercsw
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper investigates the fnite-time consensus problem of multi-agent systems with single and double integrator dynamics,respectively.Some novel nonlinear protocols are constructed for frst-order and second-order leader-follower multi-agent systems,respectively.Based on the fnite-time control technique,the graph theory and Lyapunov direct method,some theoretical results are proposed to ensure that the states of all the follower agents can converge to its leader agent s state in fnite time.Finally,some simulation results are presented to illustrate the efectiveness of our theoretical results. This paper investigates the fnite-time consensus problem of multi-agent systems with single and double integrator dynamics, respectively. Home novel nonlinear protocols are constructed for frst-order and second-order leader-follower multi-agent systems, respectively. fnite-time control technique, the graph theory and Lyapunov direct method, some theoretical results are proposed to ensure that the states of all the follower agents can converge to its leader agent s state in fnite time. Finally, some simulation results are presented in FIG. the efectiveness of our theoretical results.
其他文献
7月底,国家发展改革委印发2005年国家重点建设项目名单,共有145个项目,其中电力项目52项(名单见下表)。52项国家重点电力建设项目1.长江三峡工程:枢纽及移民工程;送出工程2.
This paper investigates the H∞ filtering problem for a class of linear continuous-time systems with both time delay and saturation. Such systems have time dela
In this paper,we present a novel algorithm for odometry estimation based on ceiling vision.The main contribution of this algorithm is the introduction of princi
This paper describes the analysis and design of an assistive device for elderly people under development at the EgyptJapan University of Science and Technology(
湖北潜江晋煤金华润化肥有限公司二分厂的2套200 kt/a合成氨生产装置并联运行,该2套装置于2011年6月竣工后开始试运行.在试运行期间,由于前工段造气工段在设计和安装上存在不
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
This paper describes a person identifcation method for a mobile robot which performs specifc person following under dynamic complicated environments like a scho
For the existing problems of walking chair robot such as simple function,lower bearing capacity and not walking in complex environment,a novel varistructured qu
中国电力企业联合会秘书长王永干日前在京表示,预计今年下半年全国电力供需形势依然紧张,但进入四季度后,供需缺口将明显缩小;自实施煤电价格联动以来,发电企业的经营状况已
The problem of linear systems subject to actuator faults(outage,loss of efectiveness and stuck),parameter uncertainties and external disturbances is considered.