Application of Parallel Mechanism in Varistructured Quadruped/Biped Human-carrying Walking Chair Rob

来源 :International Journal of Automation and Computing | 被引量 : 0次 | 上传用户:t573249005
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
For the existing problems of walking chair robot such as simple function,lower bearing capacity and not walking in complex environment,a novel varistructured quadruped / biped human-carrying walking chair robot is proposed.The proposed robot could be used as biped and quadruped walking chair robots.Considering the conversion of the walking chair robot from the quadruped to the biped or vice versa,6-UPS and 2-UPS+UP(U,P and S are universal joint,the prismatic pair,and sphere joint,respectively) parallel mechanisms are selected as the leg mechanism of the biped walking robot and quadruped walking robot,respectively.Combining the screw theory and theory of mechanism,the degrees of freedom of the leg mechanism and the body mechanism in diferent motion states are computed so as to meet the requirements of mechanism design.The motion characteristics of the 2-UPS+UP parallel mechanism which is the key part of the walking chair robot are analyzed.Then,the workspace of the moving platform is drawn and the efect of the structural parameters on the workspace volume is studied.Finally,it is found that the volume of the workspace of the moving platform is bigger when the side length ratio and the vertex angle ratio of the fxed platform and the moving platform which are isosceles triangles are close to 1.This study provides a theoretical foundation for the prototype development.
其他文献
This paper deals with the problem of designing a robust discrete output-feedback based repetitive-control system for a class of linear plants with periodic unce
In this paper, an adaptive type-2 fuzzy sliding mode control to tolerate actuator faults of unknown nonlinear systems with external disturbances is presented. B
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
7月底,国家发展改革委印发2005年国家重点建设项目名单,共有145个项目,其中电力项目52项(名单见下表)。52项国家重点电力建设项目1.长江三峡工程:枢纽及移民工程;送出工程2.
This paper investigates the H∞ filtering problem for a class of linear continuous-time systems with both time delay and saturation. Such systems have time dela
In this paper,we present a novel algorithm for odometry estimation based on ceiling vision.The main contribution of this algorithm is the introduction of princi
This paper describes the analysis and design of an assistive device for elderly people under development at the EgyptJapan University of Science and Technology(
湖北潜江晋煤金华润化肥有限公司二分厂的2套200 kt/a合成氨生产装置并联运行,该2套装置于2011年6月竣工后开始试运行.在试运行期间,由于前工段造气工段在设计和安装上存在不
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
This paper describes a person identifcation method for a mobile robot which performs specifc person following under dynamic complicated environments like a scho