以北京市“2015-07-18”及“2016-07-20”等2场短历时、高强度特大暴雨为例,对南干渠工程输水设施的积水情况进行了分析,对城市地下管涵附属建筑物防汛工作提出了合理化建议,对今后规划和制定南水北调配套工程的防汛预案有一定的借鉴作用。
Taking two short duration and high intensity heavy rainstorms such as Beijing “2015-07-18” and “2016-07-20” in Beijing for example, the water conditions in the water conveyance facilities in the South Main Canal were analyzed. Put forward reasonable suggestions to the flood control work of ancillary buildings in urban underground culverts and have some reference to plan and plan for the flood control of the South-North Water Diversion Project in the future.