论文部分内容阅读
文章介绍了三盛公水利枢纽工程中闸门和启闭机的布置情况和改造设计,对实施过程中出现的问题及处理措施进行了阐述。
This article introduces the layout and reconstruction design of the gates and hoists in the Shengsheng public water conservancy project, and expounds the problems and measures in the process of implementation.