鲁布革水电站堆石坝的施工

来源 :人民珠江 | 被引量 : 0次 | 上传用户:dai841012
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、工程概况鲁布革水电站大坝为风化料心墙堆石坝,坝区河床宽约50m,坝基砂砾石覆盖层深度一般5m左右,坝基和两岸坝肩为白云岩和石灰岩。最大坝高103.5m,坝顶高程1138m,坝顶长217.3m,坝顶宽10m并设有防浪墙,水库总库容1.11亿m~3,有效库容0.74亿m~3。上下游坝坡均为1:1.8。上游坝坡以外为施工高水围堰的两层反滤料、风化料斜墙,保护层石碴料,围堰堆石料是坝体的堆石料一部份。下游围堰距坝趾51m处,围堰为粘土心墙及石碴料填筑。下游坝趾设有混凝土量水堰。坝两岸设置有上中层灌浆洞,沿坝轴线设有单层帷幕 I. Project Overview The dam of Lubuge Hydropower Station is a weathering material rockfill dam with a width of 50m in the dam area and a depth of about 5m on the dam foundation sand and gravel cover. The dam foundation and the dam abutments on the two banks are dolomite and limestone. The maximum dam height is 103.5m, the crest elevation is 1138m, the crest length is 217.3m, the crest width is 10m and the anti-wave wall is provided. The total reservoir capacity is 111 million m 3 and the effective storage capacity is 74 million m 3. Upper and lower dam slope are 1: 1.8. Outside the upstream dam slope, two layers of filter materials, weathering material inclined walls, protective layer ballast materials and cofferdam rockfill materials are two layers of high-quality cofferdam for dam construction. Downstream cofferdam toe 51m, cofferdam core wall and ballast material filling. The downstream dam toe with a concrete water weir. The upper and middle layers of grouting holes are arranged on both banks of the dam, and a single curtain is arranged along the axis of the dam
其他文献
The global collisional orogenic events (e.g. Grenvil-lian or Pan-African event) have occurred for several times since 2.5 billion years (Ga) ago, which has led
ARIES是GEO X公司开发研制的一套全新的网络遥测地震仪。它是ARAM 2 4的升级产品。其中包括新的大线设备、新的电缆、新的中央记录系统以及新的软件。ARIES中央记录系统应用WINDOWS NT为其操作系统 ,并使
The distribution of “molecular fossils” (bio-markers) of steroid compounds in extracts from some spe-cific geologic age in the Tarim Basin have been analyzed
本文对盘锦地区河道防洪提出一些看法,值得有关省市参考,根据1985年防汛经验教训来看,防洪工程不仅要注意堤防,还应注意清障;不仅要注意干流,也得考虑小支流:不仅要防护广大
Here we discussed rapid response of the cave temperature and vegetation to the four Dansgaard-Oeschger cold and warm cycles during 50-40 kaBP based on results o
北江上游是广东省水土流失严重地区之一,水土流失面积1100km~2,约占全省的10%。1985年省人大会议通过了《关于防治北江上游水土流失议案》,并作出决议,从1986年开始,用10年时
与 2 0 0 0年第 1 2期TLE上发表的SEG 2 0 0 0年度会议综述相似 ,本文是笔者对 2 0 0 1年度会议的一些个人看法。根据我的经验及与许多同行的讨论 ,我们认为今年并没有出现重大技术
苏联在东西伯利亚叶尼塞河的上游,陆续修建了许多大型水电站,计划在10年后,包括正在运行的电站在内,将有大小17座水电站(总计装机容量为3900万千瓦)投产,其中,装机容量600万
本文介绍的方法,考虑了应力主轴的旋转效应,引入与三维光弹性模型切片相关的光学等效模型和离散模型,将光线通过实际切片的光学效应,用光学等效模型和离散模型来表示。用实验