论文部分内容阅读
一、概述刘庄引黄闸是废旧建新工程,位于刘庄灌区的渠首。1979年建成并投入运用。设计灌溉引水量80米~3/秒,过闸水头差0.3米。该闸为桩基开敞式结构,共三孔,每孔净宽6米。闸下游浆砌石消力池长20米,深0.8米,后接各
First, an overview Liuzhuang cited yellow gate is a waste of new construction projects, located in Liuzhuang Irrigation District head. Built in 1979 and put into operation. The design of irrigation water diversion volume of 80 meters to 3 / second, gate clearance of 0.3 meters. The gate open structure for the pile, a total of three holes, each hole net width of 6 meters. Gates downstream of mortar slurry pool length 20 meters, 0.8 meters deep, followed by each