论文部分内容阅读
进度控制是工程建设项目中与质量、投资控制并列的三大控制之一。江阴大桥钢箱梁的组装与焊接是江阴大桥实体形成的主要阶段 ,对其进度实施动态控制 ,是保证钢箱梁制造满足大桥建设总进度要求的重要手段。主要介绍江阴大桥梁段制造、装配的进度控制情况
Progress control is one of the three major control projects in construction projects that are tied with quality and investment control. The assembly and welding of steel box girder of Jiangyin Bridge is the main stage of the entity formation of Jiangyin Bridge. The dynamic control of its progress is an important means to ensure the manufacture of steel box girder to meet the total construction requirements of the bridge. The main section of Jiangyin bridge manufacturing, assembly progress control