CHARACTERISTICS ANALYSIS OF THE INDUCED OVERCURRENT GENERATED BY CLOSE TRIGGERED LIGHTNING ON THE OV

来源 :热带气象学报(英文版) | 被引量 : 0次 | 上传用户:ruanjianshixi
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Techniques of artificially-triggered lightning have provided a significantly useful means to directly measure various physical parameters of lightning discharge and to conduct research on protection methods of lightning electromagnetic pulses. In this study, using capacitive and resistive dividers, current probes and optical fiber transmission devices, we measured and analyzed the induced overvoltage on the overhead transmission line and the overcurrent through Surge Protective Devices (SPD) when a lightning discharge was artificially triggered nearby on August 12, 2008 at Conghua Field Lightning Experiment Site. The triggered lightning discharge contained an initial current stage and eight return strokes whose peak currents ranged from 6.6kA to 26.4kA. We found that overcurrents through SPD were induced on the power line both during the initial continuous current stage and the return stroke processes. During the return strokes, the residual voltage and the current through the SPD lasted up to the ms (millisecond) range, and the overcurrents exhibited a mean waveform up to 22/69μs with a peak value of less than 2kA. Based on the observed data, simple calculations show that the corresponding single discharge energy was much greater than the values of the high voltage pulse generators commonly used in the experiments regulated for SPD. The SPD discharge current peak was not synchronous to that of the residual voltage with the former obviously lagging behind the latter. The SPD discharge current peak was well correlated with the triggered lightning current peak and the wave-front current gradient. The long duration of the SPD current is one of the major reasons why the SPD was damaged even with a big nominal discharge current.
其他文献
在长大隧道施工过程中,由于工程地质条件的复杂性和不确定性,常会出现如塌方、涌水等地质灾害,为了规避这些地质灾害的发生,在施工过程中实施综合地质超前预报就显得十分有必
针对保德神东发电公司135MW CFB锅炉SO2排放超标问题,分析原有炉内脱硫系统脱硫效率达不到设计值的原因,并结合国内同类型CFB锅炉SO2排放浓度不达标的原因情况和炉内脱硫系统
工程管理专业是一个集管理、施工、计算等多方面知识于一体的专业,社会上对于工程管理专业的学生要求非常高,从房地产前期规划评估,到施工中看图计算,以及这其中的管理投资控
Based on the daily rainfall datasets of 743 stations in China and the NCEP/NCAR monthly reanalysis data during the period of 1960-2003, the relationship between
与人类生存息息相关的天气和气候总在随时变化,有时甚至发生极其显著的异常情况,给人类社会发展和生存带来极大影响和威胁.
Secondary flow plays an important role in the development of dunes.To investigate this phenomenon,we simulated models of transverse dunes with different stoss s
It is well known that oil generated from source rocks of saline-lake facies is characteristic of low Pr/Ph ratio and high contents of gammacerane. The authors f
基本建设投资的静态结构效益是从资源配置角度分析和考察总体投资的经济效益,其核心问题是投资的资源配置效率以及投资的合理程度.这对于制定科学、合理的投资政策具有十分重
为国家找大矿、找好矿,是地勘单位的基本职责和赖以生存的基础;开发矿业,走探采一体化之路是新形势下增强地勘单位实力的方向:探矿工程既是地质找矿不可缺少的方法,也是获取
当前,国家加大了交通基础设施建设投入,建设的规模日益扩大。然而,路桥施工企业在机遇面前却遭遇资金日益紧张的国境,不仅严重影响了企业的正常经营,而且极大地制约了企业的