论文部分内容阅读
一、关于土方单价的研究土方单价,怎样规定才合理,这是一个很复杂的问题。五一年河南复堤,据沿河各县群众反映:(一)粘锨点土、牛头淤、硬板沙,在做工时要多费一倍至三倍的力气。工具及衣服也均易损耗尚不计算在内。但是难土加资,依照规定,最少的为每方加小米二两,最多的加十两就太不合乎实际了。升高加距规定的倍数太少,五十公尺远距的标准方,包括塘深及堤高共三公尺。(二)这种算法只图省事,群众吃亏太大,最合理的是
First, the study on the unit price of earthwork Earthwork unit price, how to make provisions is reasonable, this is a very complex issue. In May 2001, the embankment in Henan Province was reported to the masses in all counties along the river: (1) Viscous soil, bullhead silt and hard board sand were used to double or triple the effort when working. Tools and clothes are also easy to wear and tear are not counted. However, hard-soil capital increase, in accordance with the provisions of at least for each side plus millet twenty-two, plus up to twelve is too realistic. Increase and increase the distance from the specified multiple too small, 50 meters away from the standard side, including Tang Shen and embankment height of three meters. (B) This algorithm only save trouble, the masses suffer too much, the most reasonable is