苏布雷水电站项目是中国水利水电五局第一个国外大型EPC(设计Engineer、采购Procure、施工Construct/交钥匙总承包)总承包项目,也是科特迪瓦在建的最大工程项目。工程所需的设备物资总量较大,大部分施工的设备物资都需要从国内或第三国进口,但由于科特迪瓦清关程序复杂,需要发货人和收货人多次反复传递相关的文件才能完成清关单据的准备。基于此,重点介绍了苏布雷水电站项目设备物资进口程序和产生的相关费用,为其他国际工程项目设备物资清关进口手续的办理提供参考。
The Subei hydropower project is the first EPC project (Design Engineer, Procure Procurement, Construction Construct / Turnkey Contract) contracting project in China and the largest project under construction in Cote d’Ivoire. The equipment requires a large amount of equipment and materials, most of the construction equipment and materials need to be imported from the country or from a third country. However, due to the complicated customs clearance procedure in Cote d’Ivoire, the consignor and the consignee are required to repeatedly transmit relevant documents repeatedly Preparation of customs clearance documents. Based on this, the import procedures and the related expenses incurred for equipment and materials import of Suburi Hydropower Station are mainly introduced, which can provide references for the handling of import clearance procedures of equipment and materials of other international projects.