论文部分内容阅读
今年山东省黄河冬修任务很大,加修临黄大堤、北金堤和东平湖二级湖堤以及疏浚流长河引河等工程,共计划修做土方七百四十六万立方米,隐工护滩整修和东平湖加修石护坡工程,共计划石方七万八千立方米,动员劳力十六万人,于十一月初已全面开工。由于时间短,任务重,天气多雨,土料湿,冬修任务十分艰巨。为了做好冬修工作,山东河务局于十月上旬召开了冬修工作会议,参加会议的有各修防处及位山工程
This year, the task of winter maintenance of the Yellow River in Shandong Province is very large. It will repair 7,446,000 cubic meters of earthwork by rebuilding Lin Proletariat, the North Jindi and Dongping Lake secondary embankments and dredging and flowing rivers. Beach renovation and Dongpinghu plus repair stone slope protection project, a total of 78,000 cubic meters of stone plan to mobilize the labor force of 160,000 people, in early November has been fully started. Due to the short time, heavy task, the weather is rainy, wet soil, winter repair task is very arduous. In order to do a good job in winter repair work, the Shandong River Bureau held a Winter Work Conference in early October. At the meeting,