论文部分内容阅读
无产阶级文化大革命以来,首都住宅建筑量逐年增长,以墙体改革为中心的建筑业技术改造迅速开展。1975年春,我们接受了一项大模板试验住宅的设计任务,在北京市第三建筑工程公司和建设单位的大力配合下,进行了三结合现场设计,施工单位工人师傅直接参加了设计。经过一段设计、施工实践,对大模板施工这个新事物有了一些初步的认识。现在就设计中的几个问题简单介绍于后。
Since the proletarian cultural revolution, the amount of residential buildings in the capital has increased year by year, and the technological transformation of the construction industry centered on the reform of the wall has been rapidly carried out. In the spring of 1975, we accepted the design task of a large formwork test dwelling. Under the strong cooperation of Beijing Third Construction Engineering Company and the construction unit, we conducted a three-in-one design on the site. The construction unit worker’s master directly participated in the design. After a period of design and construction practice, we have some preliminary understanding of this new form of construction. Several issues in the design are now briefly introduced.