北京新机场航站楼建筑规模宏大、主体结构体系复杂、地层土质不均匀、航站楼中心区地下2层设有高铁和地铁车站且高铁等轨道贯穿,因此本工程基础采用基于差异变形控制准则确定的桩筏基础设计方案。通过对勘察报告地层参数指标和试验桩数据的分析,比选确定基桩桩型、桩端持力层与桩长、成桩施工工艺及后注浆工艺参数,考虑基桩-筏板基础-地基协同作用并依据岩土工程数值计算分析结果指导桩基设计方案的调整优化,经过多次反复迭代循环,最终所确定的桩筏基础设计方案满足建筑基础沉降变形控制的严格要求。
The new airport terminal building in Beijing has a large scale, complex main structural system and uneven soil layers. There are high-speed railways and metro stations on the second basement of the terminal area and high-speed rail and other railways run through. Therefore, the project foundation is based on the principle of differential deformation control Determine the design of piled raft foundation. Through the analysis of formation parameters and test pile data in the investigation report, comparing and determining the pile type of foundation pile, the bearing layer and pile length of pile tip, the construction technology of pile foundation and the post-grouting process parameters, considering the foundation pile- The synergetic effect of foundation and the adjustment and optimization of the design scheme of pile foundation are guided by the numerical calculation and analysis results of geotechnical engineering. After repeated iteration cycles, the final design scheme of piled raft foundation meets the rigorous requirements of settlement control of building foundation.