铜录山矿是大冶有色金属公司的主要生产矿山,储量大,品位高,建设条件好。该矿一期工程于一九六五年开始建设,设计规模为日产矿石4000吨,其中露天开采和坑内开采各2000吨。自一九七○年投产以来,由于坑內开采长期达不到设计能力,采矿损失率又很大,因而出现两种意见:一种意见认为,全部改用大露天开采;另一种意见仍维持小露天加坑內联合开采。上述两种意见,经过多次现场会议
Copper recorded mine is Daye Nonferrous Metals Company’s main production mines, reserves, high grade, good construction conditions. The first phase of the mine was started construction in 1965 with a designed scale of 4,000 tons of ore per day, of which 2,000 tons are for open pit mining and pit mining. Since its commencement in 1970, there have been two opinions arising from the fact that the pit-mining has not reached the design capacity for a long period of time and the loss rate of mining has been very high. One opinion is that all of it has been converted to open-pit mining. Another view is that Maintain small open pit plus pit joint mining. The two opinions, after many on-site meetings