前言长江三峡水利枢纽工程建设规模宏伟,举世瞩目。经过三十多年的研究,工程建设条件已经成熟。目前,按正常蓄水位150米方案的初步设计报告已编制完成,但各项研究工作仍在继续抓紧进行。我国解放后三十余年的建坝经验,特别是葛洲坝工程的实战准备,为三峡工程建设奠定了坚实的基础。从宏观决策上可以断言,三峡工程建设没有克服不了的技术问题,完全可以依靠我国目前的技术力量胜利建成。但是,鉴于三峡工程的巨大规模和它在我国经济建设中的重要地位,也考虑到我国水电建设的施工技术水平特别是施工管理水平与先进资本主义国家尚有较大的差距,对各项具体技术方案的研究
Foreword The Three Gorges Project of the Yangtze River has a magnificent scale of construction and attracts worldwide attention. After thirty years of research, construction conditions have matured. At present, the preliminary design report based on the 150-meter normal water level has been prepared, but all the research work is still on tight. More than thirty years after the liberation of our country’s dam experience, especially the actual preparation for the Gezhouba Dam project, has laid a solid foundation for the Three Gorges Project. Judging from macroeconomic policy-making, it can be concluded that the Three Gorges Project has not overcome the technical problems that can not be overcome and can be completed by relying on the current technological strength of our country. However, in view of the huge scale of the Three Gorges Project and its important position in the economic construction of our country, it is also considered that there is still a large gap between the construction technology level of hydropower construction in our country and the advanced capitalist countries in particular. Technical program research