论文部分内容阅读
上钢一厂转炉车间在1954年采取增产的技术措施。这次措施由于上级的大力支持和我厂职工的努力,使工程完工日期较国家控制提前了四个多月,较年度国家计划提前了两个多月;由于措施的提前投入生产,使我厂转炉车间多生产了将近9000吨钢。
Steel plant in a converter workshop in 1954 to increase production of technical measures. Due to the strong support from the superior and the efforts of our factory staff, this measure advanced the completion date of the project by more than four months ahead of the state control and more than two months ahead of the annual national plan. As the measures were put into production in advance, More than 9,000 tons of steel are produced in the converter shop.