论文部分内容阅读
2013年5月的一天,在南郊粮食收储库的33·34号库内,3名职工用自制的“电动插线器”仅用12小时就完成了8米装粮面的电缆线压线工作。“技改之前这么快就能完成工作,根本就不可想象。”在场的职工无不称赞自制“电动插线器”快捷、实用。按照以往的检测要求,一栋仓房依粮食储存高度,要上下左右固定间隔、均匀布设横纵交错的三四百个检温点,通过电子测温系统采集不同粮面、不同仓位的粮温,达到全面监控目的。在布设埋放各电缆线时,通常是两名保管员用若干节铁钎绑住电缆线依次从粮面逐个压入相应检温点,既费时又费力。但随着新
One day in May 2013, in No. 33.34 of the Grain Storage and Storage Complex in the southern suburbs, three workers completed the 8-meter food-filled cable in just 12 hours using a self-made “electric plug” Pressure line work. “Before the technical reform can finish the work so fast, it is unthinkable. ” The presence of the staff are all praised self “electric sockets ” fast and practical. According to the previous testing requirements, a warehouse according to the grain storage height, to a fixed interval up and down, uniform layout of vertical and horizontal three or four hundred points, through the electronic temperature measurement system to collect different food surface, grain temperature in different positions, To achieve full monitoring purposes. Laying the laying of the cables, usually two custodians with a few pieces of iron brazing cable tied one by one from the surface of the press into the corresponding inspection point, both time-consuming and laborious. But with new