论文部分内容阅读
本文介绍了三峡右岸模型水轮机试验研究的基本情况,并介绍了模型验收试验的有关情况。
This paper introduces the basic situation of experimental research on the right bank of the Three Gorges hydropower project and introduces the relevant situation of the model acceptance test.