八六年十一月八日,唐山新区热力管网工程一次通过总交工验收,并被评为优秀设计和优质工程。 唐山市新区供热管网是唐山市恢复建设工作中的一部分,为了解决新区居民冬季取暖及工业企业生产用蒸汽而建设的。概算投资2197万元,工业管网长6232米,民用管网长9780米,热力站15座。今年已实现民用供热面积102万平方米,工业用户7家,用汽量
On November 8, 1986, the thermal power network project of Tangshan New Area passed the acceptance inspection and was rated as excellent design and quality project. The Tangshan New District Heating Pipeline Network is part of the restoration and construction work in Tangshan City. It was built to address residents’ heating in winter in the New District and the use of steam for industrial production. The estimated investment is 21.97 million yuan, 6232 meters long of the industrial pipe network, 98,000 meters of civilian pipe network, and 15 heat stations. This year has achieved a civil heating area of 1.02 million square meters, 7 industrial users, steam consumption