论文部分内容阅读
结合多布水电站的工程实际,介绍利用井点降水解决该电站软土地基深厚砂层基坑排水问题,取得了良好效果,可为同类工程地基处理和降水方案的选择提供参考。
Combined with the engineering practice of Dobu hydropower station, this paper introduces the use of well point precipitation to solve the problem of drainage of deep foundation pit of soft soil foundation in this power station, and obtains good results. It can provide references for the similar engineering foundation treatment and precipitation plan selection.